[Doku] Massiver Ausbau in Berlin: 171km Neue U-Bahn? 10 Neue Tramstrecken (2023)

Bahnwelten14 minutes read

Berlin's public transport system, including S-Bahn, subway, and tram, is undergoing significant expansion to accommodate the growing population, with plans for new lines, extensions, and revitalization projects in progress. The expansion aims to improve connectivity and transportation options throughout the city, with various construction and feasibility studies currently underway for future development and enhancements.

Insights

  • Berlin's public transport system is undergoing significant expansion, including extensions of subway lines like the U7 to the capital airport BER and the S-Bahn expansion project S21 connecting northern and southern Ringbahn via the main station and Potsdamer Platz.
  • The revitalization of transportation infrastructure in Berlin includes plans for a new subway ring line, tram route expansions, and the revival of historical railways like the Siemens Railway and the Dresden Railway, aiming to enhance connectivity and reduce travel times across the city and beyond.

Get key ideas from YouTube videos. It’s free

Recent questions

  • What are the upcoming expansions in Berlin's public transport?

    Berlin's public transport is set to undergo significant expansion, including extending subway lines, creating new routes, and revitalizing old railways. The subway line 3 will be extended, the U7 line will reach the capital airport, and feasibility studies are being conducted for extensions of the U8 and U2 lines. A new subway ring line is planned, along with tram route expansions. The S-Bahn expansion project S21 aims to connect the northern and southern Ringbahn, while the Siemens Railway is set to be revitalized. Plans also include extending the S-Bahn line 75 and the S2 line, as well as reviving the Dresden Railway and Heidekrautbahn.

  • When will the subway line 3 extension to Mexicoplatz be completed?

    The extension of subway line 3 from Krummen Lanke to Mexicoplatz is expected to start construction in 2026, with trains running on the new route by 2031. This extension is part of the significant expansion plans for Berlin's public transport system to accommodate the growing population and improve connectivity in the city.

  • What is the purpose of the new subway ring line in Berlin?

    The new subway ring line in Berlin is planned to offer transfer options and tangential connections, particularly in the Treptow Köpenick area. This new line aims to enhance the overall public transport network in the city by providing additional routes and improving accessibility for residents and visitors.

  • Which areas in Berlin are being considered for S-Bahn line extensions?

    Plans to extend the S-Bahn line 75 from Wartenberg to Karower Kreuz are being considered for improved tangential connections and district connectivity in Pankow. Additionally, the S2 line in the south of Berlin is planned to be extended to Rangsdorf, with potential extensions of the S25 to Velten in the north also under consideration. These extensions aim to enhance connectivity and accessibility in different parts of the city.

  • What is the timeline for the revitalization of the Siemens Railway in Berlin?

    The Siemens Railway, shut down in the 1980s, is set to be revitalized, with construction work potentially starting in 2026 and trains running by 2029. This project is part of the efforts to expand and improve Berlin's public transport system, providing additional options for commuters and enhancing transportation infrastructure in the city.

Related videos

Summary

00:00

Berlin's Public Transport Expansion Plans

  • Berlin's public transport, including S-Bahn, subway, tram, and regional transport, is set to undergo significant expansion to accommodate the growing population.
  • The subway line 3 will be extended by one station from Krummen Lanke to Mexicoplatz, with construction expected to start in 2026 and trains running on the new route by 2031.
  • The U7 subway line is planned to be extended from Rudow to the capital airport BER, with a cost-benefit analysis being conducted for funding approval.
  • Feasibility studies have been conducted for extensions of the U8 towards Märkischesviertel and the U2 towards Pankow Church, but no concrete measures have been taken yet.
  • A new subway ring line is planned to offer transfer options and tangential connections, particularly in the Treptow Köpenick area.
  • Tram routes are also being expanded, with a new route from Alexanderplatz to Tiergarten along Leipziger Straße set to be completed by 2028.
  • The S-Bahn expansion project S21 aims to connect the northern and southern Ringbahn via the main station and Potsdamer Platz, with construction ongoing and expected completion in 2024.
  • The Siemens Railway, shut down in the 1980s, is set to be revitalized, with construction work potentially starting in 2026 and trains running by 2029.
  • Plans to extend the S-Bahn line 75 from Wartenberg to Karower Kreuz are being considered for improved tangential connections and district connectivity in Pankow.
  • The S2 line in the south of Berlin is planned to be extended to Rangsdorf, despite economic concerns, with potential extensions of the S25 to Velten in the north also under consideration.

16:21

Berlin Railway Revival Enhances Travel Efficiency

  • The revival of the Dresden Railway includes laying two tracks from Südkreuz towards the Berlin outer ring and BER airport, aiming to reduce travel times to Dresden and the airport by the end of 2025. Additionally, the Heidekrautbahn from Basdorf via Schildow to Berlin Gesundbrunnen is set for revival, with planning approval in progress. Deliveries of the 483 and 484 series for the Berlin S-Bahn are ongoing, while new vehicles are planned for the tram and subway in Berlin in the coming years, amidst exciting developments in the city due to a new government and various projects transitioning from early planning to potential construction phases.
Channel avatarChannel avatarChannel avatarChannel avatarChannel avatar

Try it yourself — It’s free.