Learning Network Cable Management - A Small Business Open Frame Rack Build

TCI Productions2 minutes read

Derek presents a video on network cable management for a small office project, organizing Cat6 wires, mounting a rack unit, installing patch panels, and securing cables for a professional finish. The speaker concludes his presentation, leaving the installation process to the customer's technology staff, hinting at more upcoming videos and thanking the audience for watching.

Insights

  • Utilizing Chase pipes or grommets for cable transitions and organizing Cat6 wires in manageable groups of 24 are crucial steps in maintaining a professional network cable management system.
  • The installation process involves patch panels, all-in-one crimp tools, and saddle straps to achieve a clean and neat appearance, emphasizing the importance of structured termination and securing cables for a polished finish.

Get key ideas from YouTube videos. It’s free

Recent questions

  • How many wires are left in the ceiling for the small office project?

    73 Cat6 wires

  • What is used to create an entry path from the ceiling to the lower space?

    Chase pipe

  • How are the Cat6 wires organized for easier management?

    In groups of 24

  • What tool is used to terminate cables in the small office project?

    All-in-one crimp tool

  • What is mounted on the wall using screws and washers in the office project?

    12 rack unit open frame

Related videos

Summary

00:00

Efficient Network Cable Management for Small Office

  • Derek from TCI presents a video on network cable management for a small office construction project.
  • The office will accommodate 25 people and printers, with a total of 73 Cat6 wires of different colors left in the ceiling by installers.
  • A Chase pipe is built at the top of the backboard to create an entry path from the ceiling to the lower space.
  • Transitioning cables between spaces involves using grommets or Chase pipes for a professional finish.
  • The Cat6 wires are combed and organized in groups of 24 for easier management.
  • A 12 rack unit open frame is mounted on the wall using screws and washers, with cage nuts not utilized.
  • Patch panels are installed following a plan to allow for termination with freedom of movement.
  • Cables are terminated using an all-in-one crimp tool and compatible Jacks for beginners' ease.
  • Slack is rolled back into the ceiling, and cables are secured with saddle straps for a neat appearance.
  • The final step involves patching in switches, a router, and cable managers, ensuring a clean and professional finish.

16:44

Speaker completes job, hints at more videos.

  • The speaker's job is complete, and the customer's technology staff will install a UPS under the rack and connect the internet provider.
  • The speaker will not be involved in the installation process, concluding the video.
  • The speaker hints at more upcoming videos and thanks the audience for watching.
Channel avatarChannel avatarChannel avatarChannel avatarChannel avatar

Try it yourself — It’s free.