Estimate of Earthwork for Roads [Year 4]
Mobile Tutor・2 minutes read
Road construction involves excavation, leveling, cutting, and filling of earth work in relation to the formation line. The quantity of earth work is calculated manually or using computer applications, considering factors like lead, lift, flood levels, gradient, and height of the bank.
Insights
- Road construction involves a detailed process of excavating and leveling the ground, with specific considerations for banking and cutting, emphasizing the importance of precise earthwork calculations for efficient construction.
- Estimation of road work requires a comprehensive analysis of various factors such as flood levels, gradients, and bank heights, showcasing the complexity of planning roads in different terrains and the necessity of meticulous measurements like lead and lift for effective transportation and excavation.
Get key ideas from YouTube videos. It’s free
Recent questions
How is the quantity of earth work calculated in road construction?
The quantity of earth work in road construction is calculated by determining the sectional area multiplied by the length, taking into account the side slopes and mean height of the bank or depth of cutting. This calculation can be done manually or using computer applications to accurately measure the volume of earth needed for the project.
What are lead and lift measurements in road construction?
Lead and lift measurements are crucial in road construction. Lead refers to the horizontal distance for earth transportation, while lift is the vertical depth to be excavated along the formation line. These measurements are essential for determining the amount of earthwork required and ensuring proper leveling and construction along the road project.
What factors are considered in estimating road work?
Estimating road work involves considering factors such as flood level, gradient, and height of the bank. These elements play a significant role in determining the design and construction of the road, with calculations varying depending on whether the project is in plains or hilly areas. Proper estimation is essential for ensuring the road is safe and functional for users.
How is road level determined in road construction?
In road construction, the road level is determined by leveling every 30 meters along the centerline of the project. Specific scales are used for plotting longitudinal sections to ensure accurate measurements and proper alignment of the road. This process is crucial for maintaining the integrity and safety of the road infrastructure.
What is the process of road construction involving earth work?
The process of road construction involving earth work includes excavating and leveling the ground surface, with cutting and filling of earth work done in relation to the formation line. The upper portion of the earthwork is known as banking, while the lower portion is cutting. This process is essential for preparing the foundation of the road and ensuring a stable and durable structure for transportation.
Related videos
The Structural World
12 Steps of Construction
Kelvin Academy
SOLVE FOR THE CLOSED TRAVERSE SURVEYING (Real Life Site Construction Calculation)
Practical Engineering
How does land surveying work?
Engineers Wallah - AE, JE
SSC JE 2023 | Estimation Costing and Valuation | Introduction & Types | Civil Engineering
Unite Civil Hub
"Ground Improvement Techniques" | (Need of ground improvement) | Applications of ground improvement